Free weekly site safety inspection checklist for construction

22 checks for a weekly walk of the site, space for anything not OK and a photo reference, actions with a name and a date, and a sign-off. With a filled-in example.

Published 5 min read

Site safety inspection checklist

PDF, 1 page, A4 · Free · No email required

Build this checklist once in Foreman's forms, and your site manager walks the site with it on their phone, photographs anything not OK and signs, dated and against the job. Start free on your first job

One-page site safety inspection checklist with sections for paperwork, falls, electrical, excavations and plant, and the site, plus issues, actions and a signature

A site safety inspection checklist is what a site manager ticks off on a weekly walk around a building site: paperwork, falls, electrical, excavations and plant, and the site itself. This one-page version has 22 checks, space for anything not OK with a photo reference, actions with a name and a date, and the inspector's signature.

Free, no email required.

Daily pre-start or weekly inspection?

A daily pre-start is ten minutes before work: is the site safe today, for today's tasks. A weekly inspection is a slower walk of the whole site, checking that the controls you set up are still there and that work matches the SWMS. Most builders run both. The pre-start catches today's problem. The weekly walk catches the slow drift: the edge protection that's been moved, the leads that have migrated into puddles, the SDS folder that walked off.

No law sets a weekly inspection by name. Builders must identify hazards, control them and check the controls still work (model WHS Regulations, regs 34 to 38). A regular, recorded walk is the usual way to show you do. Victoria isn't under the model WHS laws, but its general duties lead to the same place.

What goes on the checklist

Paperwork. SWMS on site for all high risk work, and the work actually matches it. Workers inducted and white cards sighted. The hazardous chemicals register and safety data sheets on site. On a construction project, the principal contractor's sign up where it can be seen from outside, with their name, phone numbers including after hours, and where the site office is (model WHS Regulations, reg 308; the dollar threshold for a construction project varies by state, Western Australia doesn't use this rule, and Victoria has its own).

Falls. Edges, voids and penetrations protected. Roof edge protection. Ladders in good condition and set up right. Harness gear inspected, with a rescue plan. The scaffold tag current. If it isn't, run a scaffold inspection.

Electrical. Leads off the ground and undamaged, test tags current, RCDs in use and tested, the switchboard closed. Keep the detail in a test and tag register.

Excavations and plant. Excavations barricaded with spoil kept back from the edge, plant pre-use checks done, exclusion zones set up.

The site. Housekeeping and clear access, fencing and signs that keep the public out, clean amenities, a stocked first aid kit and a known first aider, fire extinguishers in date, and dust controls for cutting, because of silica.

Anything not OK. What, where, what you did about it, and a photo reference. Then the actions: what, who and by when.

Site safety inspection example: one filled-in walk

This is one weekly walk on a two-storey house frame, filled in the way the template asks. The job and the names are made up.

Date: Tuesday 17 November. Inspected by: Dan Pearce, site supervisor.

Ticked OK: 19 of 22.

Not OK: Two leads run through the water at the back door after Monday's rain. Moved onto stands on the spot. The SDS for the new acrylic sealer isn't in the folder. The tilers' cut-off saw has no water feed connected, and they were dry cutting.

Actions: Tilers stop dry cutting now, water feed on before they restart (Dan, today). SDS printed and in the folder (Dan, by Wednesday). Leads and dust at Thursday's toolbox talk (Dan).

Signed: Dan Pearce.

Three things found, one fixed on the spot and one stopped until it's fixed. Dry cutting is the one that matters: it's a silica risk you can't see.

What people get wrong

Ticking from the site shed. The checklist is a walk, not a form. If the inspector didn't go round the back of the building, nor did the inspection.

A list of problems with no names. "Leads in water" with no name and no date is a note, not an action. Every not-OK line gets a who and a when.

Same findings every week. The same problem on three walks in a row means the fix isn't working. Change the control, or make it the next toolbox talk.

Doing it without the clipboard

In Foreman's safety forms, build the inspection once with a to-dos checklist for each section, a text field for anything not OK, a photo field, a text field for actions, and a signature. Make it available to site managers and admins only, and turn on the date lock so an inspection can't be backdated. Add a second signature field if the builder walks it too: both sign at the time, because a sent form can't be changed.

For the step-by-step, see how to build a form template. Already have a site inspection checklist on paper or as a PDF? Connect Claude or ChatGPT to Foreman, give it the file, and ask it to build the form for you.

Every inspection is saved against the job, so the weekly walks for a site are one filtered list. For the actions, assign each one as a task to one person, with the date in the task name, so what's still open shows up across every job.

The daily pre-start checklist covers each morning. The hazard report form is for the hazard someone spots between walks. For high risk work, see what a SWMS is and when you need one.

Sources

Every source used on this page traces to one of these. We recheck them when we update the page.

Frequently asked questions

What should a construction site safety inspection cover?
Paperwork (SWMS, inductions, SDSs, the principal contractor's sign), falls (edges, roof, ladders, harnesses, scaffold), electrical (leads, tags, RCDs, the board), excavations and plant, and the site itself: housekeeping, fencing, amenities, first aid, extinguishers and dust.
How often should a site safety inspection be done?
No law sets a frequency. Weekly is common on building sites, alongside a daily pre-start. Businesses must check that their controls still work (model WHS Regulations, reg 38), and a regular recorded walk is the usual way to show it.
Who should do the site safety inspection?
The site manager or supervisor responsible for the site. In Foreman you can make the inspection form available to site managers and admins only.
Marcelle Granier

“I’m not chasing people anymore, and all site information is there if we are audited.”

Marcelle Granier, Project Coordinator, Tivoli Projects · Read the case study

Keep your sites in order

The weekly walk on a phone, with photos.

Build the checklist once. Your site manager ticks the checks, photographs anything not OK and signs, dated and against the job. Free on your first job.

Foreman is a member of Master Builders Queensland.