How to get only your own staff to sign a SWMS
One site, two doors: a short induction at the gate, and the SWMS for your own staff in the app.
If only your own staff need to sign a SWMS, keep it off the gate induction and have your staff sign it in Foreman instead. Subbies and visitors scan the QR code and get a short, simple induction. Your staff log in, open the SWMS from the project's documents, and sign a SWMS sign-on form. You get a signed, dated record from each of them, and nobody at the gate wades through documents that aren't theirs.
Think of it as one site with two doors: the QR code for everyone coming through the gate, and the app for your own crew.
An Admin sets this up. A Site Manager can add documents and fill in forms on the projects they manage.
1. Keep the gate induction for everyone
The gate induction is what every subbie and visitor reads and signs. Keep it to what applies to anyone on site: site rules, the safety plan, emergency procedures, and the SWMS a subbie needs for their own work if you collect those.
If your staff SWMS is already on the induction, take it off: open the project, tap Edit, and under Induction, use the ⋯ menu on it in Extra documents for this site to delete it. If it's in the template's Documents block, remove it from the template. See how to set up a site induction.
2. Put the SWMS in the project's documents
Project Documents are only visible to logged-in crew on that project, never to people scanning the QR code.
- Open the project and tap Edit.
- Under Project documents, tap Upload and pick the SWMS as a PDF.
- Choose a folder such as "SWMS" if you like, and set Visibility to All site crew.
- Confirm the upload.
See project information and documents.
3. Make sure your staff are on the project
Staff need a Foreman login and to be on the project to see its documents and forms. Add them from the project's Edit screen, under Team. See how to add your team.
4. Build a SWMS sign-on form
An Admin builds this once and uses it on every project.
- Open Forms, then the Manage tab, and tap Create new form. Call it "SWMS sign-on".
- Under Who can fill this, choose All site crew. Under Form type, choose Project form.
- Add these blocks:
- Text: "Which SWMS have you read?"
- Date, with Lock to submission date ticked, so it can't be backdated.
- Signature.
- Tap Save form.
See how to build a form template.
5. Staff read it and sign on
Each staff member opens the project, reads the SWMS under Documents, then opens Forms, taps SWMS sign-on, picks the project, fills it in and signs. Their submission is saved against the project with their name and the time.
To check who has signed, open Forms, then the Submissions tab, and filter by the form and the project.
When the SWMS changes
Upload the new version to Project documents and delete the old one from its ⋯ menu, so nobody reads a superseded SWMS. Then ask your staff to fill in SWMS sign-on again for the revised version. Their earlier submissions stay on record.
Good to know
- Subbies' own SWMS can still go on the gate induction. If you want every subbie to sign on to a SWMS for their trade, follow how to get workers to sign on to your SWMS.
- Your crew may not see the gate induction at all. Depending on how your business records hours, logged-in crew sign each site's induction once or not at all. That's why the sign-on form is the right record for staff. See what workers see when they scan.
