How to get your site folder off paper
What's in the folder in your site shed, where each piece goes when it moves to a phone, what stays physical, and how to get the crew on board.
Move one job at a time, starting with the paperwork you chase most. Put the induction on a QR code at the gate, the SWMS and safety data sheets where every phone can open them, and the diary and safety forms onto the crew's phones. Keep a few things physical, like tags, signs and the first aid kit, and stop buying new paper.
Most small builders run a site from a folder in the shed, a WhatsApp group and a few things held in their head. It works until WorkSafe, a client or a head contractor asks for something, and nobody can put their hand on it. Going paperless on a construction site fixes the finding part. The test is simple: can you pull up last month's toolbox talk, or one subbie's induction, from your phone in under a minute?
What's in a site folder
Open the folder in your shed and you'll usually find some mix of:
- the site induction sign-in sheets
- every SWMS, with the crew's signatures
- safety data sheets for the chemicals on site
- the daily diary or day sheets
- pre-starts and toolbox talk records
- hazard and incident reports
- permits, such as hot work
- plant, scaffold and test and tag records
- plans, specs and the gate code on a sticky note
Each of these goes digital in a different way, and they don't all have to move at once.
Step 1: start with one job
Pick the next job that starts, not the one halfway through. A fresh job means a clean start, a new QR code on the gate and no half-paper, half-phone muddle.
Step 2: put the induction on the gate
The induction is where the folder usually starts, and it's the easiest win. Print a QR code, cable-tie it to the gate, and anyone arriving scans it on their own phone. They read your site rules and documents, enter their details and white card number, and sign on screen. There's no app to download and no account for them to set up.
Instead of chasing wet sign-in sheets, every induction lands in a register you can open from anywhere. How to set up a site induction walks through it.
Step 3: put the SWMS and SDS where everyone can open them
A SWMS can be kept electronically. Safe Work Australia and WorkSafe Victoria both say so. What matters is that the workers doing the job can get to it.
Upload each SWMS and your safety data sheets to the job's induction documents. Everyone inducting is shown them before they sign, and your crew can open them on their phone any time. Everyone who inducts signs on to it without a clipboard (SWMS sign-on). For crew with a login who don't sign the induction, add a short SWMS sign-on form. Plans, specs and contracts go in the job's documents, which only the people on the job can see.
Step 4: move the diary and the forms
Next, the paperwork your crew fill in every day. The diary goes first because it's the one people already do: date, hours, what was done and photos, on the phone, against the right job.
Then the safety forms, one at a time. Start with the one you chase most, usually the daily pre-start or the toolbox talk. Build it once, give it to the crew, and retire the paper version that week. Add the next one when the first is a habit. What safety forms a builder needs covers which ones to set up first.
Step 5: keep what has to stay physical
Some things stay on the wall or on the gear, whatever app you use:
- Test tags on leads and tools. The record can be digital, but a tag on the item still tells the person picking it up whether it's safe.
- The scaffold tag, so nobody climbs an unchecked scaffold.
- Site signage, including the principal contractor's sign where one is required, and emergency contacts.
- The first aid kit and the name of the first aider.
A short laminated sheet by the gate, with the QR code, the site address and the emergency numbers, covers most of it.
Step 6: stop buying paper
The old folder doesn't disappear on day one. Keep it for the jobs already running and archive it when they finish. Just don't start a new one.
What gets in the way, and how to get past it
"The crew won't use it." They will if it's quicker than the clipboard. A QR code they scan with the phone camera is quicker, and so is a short form on the phone already in their pocket. A crew member who struggles with it can be shown once at the pre-start.
"Half the subbies don't have the app." With QR inductions they don't need one. The induction runs in the phone's browser, and subbies who only induct at the gate are never counted as users.
"There's no signal at the back of the block." Foreman needs a connection to send anything, and there's no offline mode. Most sites have signal at the gate or the site shed, so do the induction and the forms there. Old phones and patchy signal has the detail.
"What if the inspector wants paper?" Records can be downloaded. Each induction downloads as a signed PDF, the diary exports as a CSV or a PDF with photos, and each job downloads as a ZIP of CSVs.
How it looks in Foreman
One QR code on the gate runs the site induction, and inductions are free and unlimited on every plan. The job's SWMS, safety data sheets and site rules sit in its induction documents, shown to everyone before they sign. The site diary records hours, work done and photos, and each entry shows when it was submitted and whether it was logged on site.
Safety forms are the ones you build. A new account starts with one sample form, and you set up the rest in a few minutes each, or hand an existing PDF to Claude or ChatGPT connected to Foreman and ask it to build the form. Your crew fill them in on their phone, with photos, signatures and a date that can't be backdated. Everything lands against the right job, and the office sees it the same day.
Related
How long to keep safety records covers what to keep after handover. If the folder is mostly a WhatsApp group, see getting your site off WhatsApp.
Sources
Every source used on this page traces to one of these. We recheck them when we update the page.
- Safe work method statement for high risk construction work: information sheet. Safe Work Australia, checked 26 October 2026.
- Safe Work Method Statements (SWMS). WorkSafe Victoria, checked 26 October 2026.
- Model Work Health and Safety Regulations (1 July 2024), regs 150, 303 and 308. Safe Work Australia, checked 23 November 2026.