How to run a toolbox talk the crew actually listen to
Eleven steps from picking this week's topic to closing out the actions, with a five-minute example and the mistakes that waste the time.
Pick one hazard that matters on this site this week, gather the crew for five to ten minutes before work starts, talk about it in terms of this job, then ask what they've noticed and wait for an answer. Agree what will be done, with a name against each action, and record the topic, who was there and what the crew raised.
No law says you must hold toolbox talks. But you must consult your workers on health and safety, and Safe Work Australia names toolbox talks as one way to do it. Run well, they're the cheapest safety tool you have. Run badly, they're a monologue with signatures on it.
Before the talk
1. Pick one topic from this week's work. If the excavator arrives Thursday, talk about trenches and plant on Wednesday. Other good triggers: new high risk work starting, a near miss, a change in the weather, new people on site. Stuck for one? Pick from 40 toolbox talk topics.
2. Walk the spot first. Two minutes looking at the actual edge, trench or scaffold gives you something specific to say. "The east edge of the slab, where the scaffold stops short" beats "falls from height" every time.
3. Have the SWMS handy if the work needs one. When new high risk work starts, the toolbox talk is where you take the crew through its SWMS. They have to understand it, and the people doing the work should have been consulted on it. See what a SWMS is and when you need one.
4. Pick the time. Start of the day, standing up, before anyone has a tool in their hand. Not at knock-off, when everyone is thinking about the drive home.
Running the talk
5. Say what it's about and why today. One sentence. "Roof sheets arrive tomorrow and we'll be working near the edge all week."
6. Make two or three points about this site. What the hazard is here, what the controls are, and what you expect people to do. Keep it to what fits in two minutes.
7. Ask a real question, then wait. "What worries you about tomorrow?" or "Where's the worst spot on this roof?" Then stay quiet longer than feels comfortable. The first answer usually comes just after you'd normally have moved on.
8. Take what they say seriously. If someone raises a problem, agree what happens next, who does it and by when. If you can't fix it today, say when you will.
9. Check everyone understood. Watch for people who don't speak up, new starters, and workers whose first language isn't English. The WHS Regulations require information and training to be given in a way the person can readily understand (reg 39). Ask someone to explain the plan back, or get a workmate to translate.
After the talk
10. Record it the same day. The Construction Work Code of Practice recommends keeping "a record of the topic covered, attendees and any feedback received". Write what was actually said, not "discussed working at heights". The free toolbox talk template has a box for each, plus actions with names against them.
11. Close out the actions. Fix what was raised, then say so at the next talk. One action finished on time does more for the next talk than any topic you could pick. If nothing ever comes of what the crew raise, they stop raising things.
What the five minutes sounds like
One talk on a house at slab stage. The job and the names are made up.
Wednesday 18 November, 6:50 am. Run by Sam (site supervisor). Topic: the sewer trench, before the excavator starts at nine.
"The excavator's here at nine to dig the sewer line down the side. It's 1.8 metres deep at the back, so it's high risk work, and the plumber's SWMS is in the ute. Read it before you go near the trench. Spoil goes on the north side, at least a metre back. Nobody goes in until the shoring box is in. When the machine's moving, stay out of its swing unless the operator has seen you."
"What's going to get in the way today?"
Tom: the side path is the only way to the skip, and the trench cuts it. Priya: the delivery truck is due at ten and backs down that same side.
Actions: Sam puts a temporary path along the south fence before nine, and rings the supplier to move the drop to the front. Both checked at Thursday's pre-start.
Attendance: six, all signed.
Mistakes that waste the five minutes
- Reading a generic sheet aloud. If it isn't about this site, nobody listens.
- Doing all the talking. The crew can see things you can't from where you stand.
- The same topic every week. Rotate with the work.
- No record, or a useless one. "Talked about safety" proves nothing in six months.
- Leaving out the subbies. The roofer's crew is working under your roof edge too. Invite them.
How often?
No law sets a frequency. Most small builders run one a week, plus one whenever new high risk work starts or after a near miss. A short daily pre-start covers the day-to-day, and the toolbox talk goes deeper on one topic. What to do after a near miss covers turning last week's close call into this week's talk.
Recording it on a phone
In Foreman's forms, build the toolbox talk record once: a date locked to the day it's sent, a dropdown or checklist for the topics, text fields for what was covered, what the crew raised and the actions, a photo of the group or the signed sheet, and a signature from whoever ran it. A new account starts with one sample form, and you build this one in a few minutes (how to build a form template).
A signature block takes one signature. For attendance, either list the names and have the person running the talk sign, or build a short sign-on form that each crew member submits on their own phone after the talk.
For subbies and visitors who don't have a Foreman login, upload the week's toolbox talk as a PDF to the site's induction documents. Everyone who scans the gate QR code is shown it before they sign their induction (how to show it at induction). That records they were shown it. It doesn't stand in for having them at the talk.
Related
The toolbox talk template is the one-page record to print. The daily pre-start checklist covers the five-minute check each morning, and what safety forms a builder needs puts the talk alongside the rest of the paperwork.
Sources
Every source used on this page traces to one of these. We recheck them when we update the page.
- Consultation. Safe Work Australia, checked 25 August 2026.
- Construction work Code of Practice. SafeWork NSW, checked 25 August 2026.
- Model Work Health and Safety Regulations (1 July 2024), reg 39. Safe Work Australia, checked 23 November 2026.
- Safe work method statement for high risk construction work: information sheet. Safe Work Australia, checked 26 October 2026.